- Home
- Our Services
- Building and development
- Building and renovating
- News
- Sewage management systems
Sewage management systems
There are a number of areas within the Maitland Local Government Area where a direct connection to Hunter Water reticulated sewer system is not available meaning that wastewater must be managed on site.
Council has a role of ensuring that on site wastewater treatment systems are installed, operated and maintained appropriately under the Local Government Act 1993.
Domestic wastewater treatment systems installed include:
- septic tanks with evapotranspiration beds or absorption trenches
- aerated wastewater treatment systems (AWTS)
- effluent pump out system
- composting systems (worm farms)
- pump to sewer systems.
For enquires of premises connected to the reticulated sewer system please contact Hunter Water on 1300 657 657.
Please note: Whilst the same application is used, an approval to install, alter or construct an on-site sewage management system (OSSM) differs from an approval to operate and you must submit both depending on your circumstances.
Yes, approval is required from Council before a waste treatment system can be installed, altered or constructed.
To apply, please complete the application to install/construct and or alter a sewage management facility and submit your application in person at Council's administration building 285-287 High Street, Maitland (Monday to Friday, 8:30am to 5.00pm) or by post to PO Box 220, Maitland 2320.
The application must include site plans, dwelling floor plan, system specification and NSW Health accreditation documents. Systems with on site effluent disposal will also require a site specific assessment report from an appropriately qualified Environmental Consultant. Application fees are payable at the time of lodgement.
It is important to contact Council's Environmental Health Officer on 02 4934 9700 before submitting an application to discuss any specific issues.
Yes, every on site system requires an approval from Council to operate. An approval is issued once the application to operate a sewage management facility is received and where a satisfactory inspection is carried out, and/or where the service history indicates the system is regularly serviced and is in good working order.
Applications can be submitted in person at Council's administration building, 285-287 High Street, Maitland or by post to PO Box 220, Maitland 2320.
Property owners must comply with the conditions of their approval. Monitoring and inspections will be undertaken and the frequency of inspections depends on the risk level assigned to your system in accordance with council’s On-Site Sewage Management Policy.
Did you know? Approval to operate an OSSM system is not transferable. New owners must submit an application to operate an OSSM system within a period of three months after the date on which the land is transferred or otherwise conveyed to another owner.
It is an offence to operate an on site system without approval from Council.
- My Neighbourhood
- My Council
- About Council
- Governance and transparency
- News and updates
- Work with us
- Planning and reporting
- Long term planning
- Maitland +10 Community Strategic Plan
- Delivery Program
- Operational Plan
- Fees and Charges
- General Purpose Financial Reports
- Resourcing Strategy
- Asset Management Plan
- Maitland Urban Settlement Strategy
- Local Environment Plan (LEP)
- Development Control Plan (DCP)
- Maitland Local Strategic Planning Statement 2040+
- Community survey reports
- Destination Management Plan
- Annual report
- Publications, plans and strategies
- Central Maitland Interpretation Plan
- Aberglassyn Structure Plan
- Manual of Engineering Standards
- Activity Centres and Employment Clusters Strategy
- Central Maitland Structure Plan
- Gilleston Heights Structure Plan
- Hunter River Branxton to Green Rocks flood study (2010)
- Hunter River Floodplain Risk Management Study and Plan (2015)
- Lochinvar Structure Plan
- Maitland Centres Study (2009)
- Maitland Integrated Land Use and Transport Study
- Maitland Rural Lands Strategy (2005)
- Thornton Structure Plan
- Maitland Bike Plan
- Discussion paper: Strengthening relationships with young people
- Rutherford Youth Protocol
- Disability Inclusion Action Plan (DIAP)
- Citizen Engagement Strategy
- Community Facilities and Services Strategy
- Lochinvar Flood Study
- Maitland Recreation and Open Space Strategy
- Open Museums Open Minds
- Wallis and Swamp-Fishery Creek Flood Study
- Long term planning
- Works and major projects
- COVID-19 Support
- Maitland your say
- Our Services
- Waste and recycling
- Building and development
- Planning Portal
- Planning information and advice
- Building and renovating
- The application process
- Planning strategies
- Property certificates
- Planning maps
- Development contributions
- Planning application forms and certificates
- Short Term Licence to Access Council Owned or Managed Land
- Community
- Community Notices
- Community services
- Citizenship ceremonies
- Grants and Sponsorship
- Education programs
- Environmental education
- Living sustainably
- Library education programs
- Art Gallery creative learning programs
- Maitland Gaol education programs
- Heritage education programs
- Service awards
- Cemeteries
- Environment
- Roads, traffic and transport
- Business
- Play & Explore
- Events
- Facilities and recreation
- Arts and culture
- History and heritage
- Resident guide
- Visiting Maitland